Innovative technologies of the heat exchanger factory

Author:jim Click: Time:2025-08-20 09:09:06


Dear Valued Customer,

To make your new heat exchanger “zero-break-in” ready, we’ve distilled our field experience from thousands of units into this pocket-sized start-up guide. Keep it with the operator on day one—and keep peace of mind every day after.



① 15-Minute Pre-Start “Safety Triple-Check”

Task

Our Friendly Tip

What to Keep in the Tool Bag

Visual & Mechanical

Use a phone flashlight to circle the unit. Look for “shiny wet spots” on welds, flanges, and plate gaskets.

Disposable gloves, absorbent paper

Instruments & Valves

Tap pressure gauges—pointers should not stick; lift the safety-valve lever—it should snap back with a click.

PTFE tape, adjustable wrench

Media Compatibility

Write design T / P on a sticky label at the inlet. One glance prevents mis-connection.

Oil-based marker tags



② First Commissioning “Slow-Three-Step” (prevents 90 % of water hammer & leaks)

  1. Cold side first: open valve to 10 %only; wait for the hiss of venting air, then open fully and slowly.
  2. Hot side second: ramp temperature ≤1.5 °C / min—about the speed a cup of tea cools.
  3. Baseline selfie: take a phone photoof the initial ΔT and ΔP; this becomes your “health passport” for futurechecks.


③ One-Touch Solutions for Special Duties

Duty

Factory Pre-Fit “Insurance”

What to Do on Site

High Pressure ≥ 10 MPa

Hydro test at 1.5 × design pressure (report included); nickel-alloy gaskets.

Step-up pressure in 25 % stages—set a 15 min phone alarm between stages.

Low Temp ≤ –20 °C

Extra 20 mm insulation + roll of aluminum tape supplied.

Pre-cool with dry N, max 2 °C / min ramp.

Corrosive Media

Upgraded tubes (2205/2507 or Ti) + corrosion-inhibitor injection port.

Inject inhibitor 30 min before start-up; keep a 200 ml sample.

Fouling Risk

Internal EP finish Ra ≤ 0.4 µm + on-line anti-scale tap.

If ΔP rises 15 % above baseline, switch to standby unit and alert our service WeChat.



④ Fast-Action “Emergency Card” (print & stick on the control-box door)

Symptom

Possible Cause

30-Second Action

Temperature 

won’t reach set-point

1. Air lock

2. Low flow

3. Fouling

Open vent 10 s → check flow meter → switch to standby

Flange leak

Mis-aligned gasket / loose bolts

Depressurize to 0.5 MPa → tighten diagonally → still leaking? swap unit

Heavy vibration

Uneven flow / loose support

Reduce flow 20 % → tighten support → photo & send to our service group



⑤ Post-Start “Three Must-Dos”

  1. Scan & Register – The QR codeon the nameplate instantly builds a digital file with all factory data andtest reports.
  2. Month-1 Check-ins – Our serviceengineer will video-inspect on day 7 and day 30—no extra charge.
  3. Spare-Parts Pouch – A small boxshipped with every unit: gaskets*2, bolts*4, safety-valve sealing*1, Storeit in the drawer of control room.



24 / 7 Emergency Hotline

As you know, Yiteng is always be with clients at any time. Contact with us for service or technical chat at any time. You will have our quick response.

May every exchanger run like a silent workhorse on your site.

Wishing you a smooth start-up!

Your Trusted Heat-Exchanger Manufacturer

YITENG PV Customer Success Team


Innovative technologies of the heat exchanger factory
heat exchanger
Long by picture save/share
0

No. 28 North Ring Road, Yuecheng Town, Jiangyin City, Jiangsu, P.R.China.

yeekai@yitengrq.com

+86 186 5249 2007

Copyright @ 2025 Wuxi Yiteng Pressure Vessel Co. Ltd. All Rights Reserved.

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了